Backup System for Private Home in Mozambique

Project Info

  • Construction Date

    December 2015

  • Category

    Backup

Quattro Backup AC 10048 for a private residence in Maputo, the capital of Mozambique. The backup system has an output power of 10kVA (1-phase). An additional implemented function allows a deeper discharge of the battery if required. An integrated bypass switch allows direct grid operation, e.g. during maintenance work on the system.